PUBLIC POWER CORPORATION OF GREECE

ALFA PI SA. has executed the following project:

   
CONSTRUCTION PERIOD
VALUE OF WORKS (€)
LAVRION POWER PLANT: Combined power generation block (2 G.T+1 S.T)
as subcontractor of BABCOCK ENERGY Ltd:
- Colling water intake GRP pipe, DN 1600mm, 1200m long
- Propane tanks & networks, both in GRP
- HVAC for control room
- Metallic / GRP Bifurcation 2x1200 to 1600mm, for main cooling pumps
May 95 – Sep. 96
783.683
LAVRION POWER PLANT: Unit no 5 of combined Cycle on one shaft, 377.66 MW
as subcontractor of RODAX/METKA:
- Mechanical installation of pressure, level and flow /measuring instruments and transmitters
- Installations of auxiliary boiler
July 05 - Dec. 05
103.000
RODOS POWER PLANT: Erection of 3 Thermal Power Units, 23.4 MW each
as subcontractors of J/V SEMT /ABB/ TECHNICAL UNION:
Erection of intake & Exhaust Gas System, including installation of equipment, airducts, pipeworks, steel construction and instrument, totaling to 530t
May 97 - Nov. 97
321.056
bottom corner